Case Study: Bluffdale Winter Freeze/Burst Delayed Discovery Response
Documentation of an extended-exposure freeze/burst supply line failure response in suburban Bluffdale, illustrating the substantial scope patterns encountered when supply line failures occur during property vacancy with extended delayed discovery. Property is a mid-2000s suburban Bluffdale two-story single-family residential property with upstairs master suite bathroom containing supply line running through exterior wall assembly. Event occurred during property owner extended vacation absence beginning early January during a substantial cold snap event with sustained temperatures below 10°F for multiple consecutive days. Supply line failure occurred approximately Day 3-4 of property vacancy (best estimate from subsequent HVAC monitoring data and water usage records) with continued supply flow through burst supply line for approximately 3-4 days before property owner return. Property owner discovered event on Saturday afternoon at approximately 4:15 PM upon return from vacation, immediately isolating water at main shutoff and identifying substantial flooding across upstairs master suite, cascading through main floor ceiling, and pooling in main floor living areas and basement. Documented outcome: extended-exposure freeze/burst response scope covering 425 square feet across three floors with initial Category 1 clean water classification advancing to Category 2 given extended exposure with visible mold development beginning, IICRC S500 Category 2 protocols with concurrent IICRC S520 mold remediation for developed mold areas, elevation-adjusted equipment deployment for Bluffdale’s approximately 4,436-foot elevation, 18-day comprehensive response timeline including remediation and reconstruction, total scope $18,600.
Property and Event Characteristics
Property Characteristics
- Location: Suburban Bluffdale, UT
- Property type: Single-family two-story residential with substantial finished basement
- Construction era: Mid-2000s
- Floor plan: Standard two-story with master suite upstairs including primary bathroom, additional upstairs bedrooms, main floor living areas, and substantial finished basement
- Supply line configuration: Standard supply line running through exterior wall assembly to upstairs master bathroom sink location
- Property occupancy: Property owner and family on extended vacation with no residence occupancy during event
- Elevation: Approximately 4,436 feet (Bluffdale typical)
Event Characteristics
- Date range: Extended vacation period during early January cold snap
- Cold snap: Sustained temperatures below 10°F for multiple consecutive days (approximate low temperatures ranged -5°F to 8°F)
- Estimated time of failure: Approximately Day 3-4 of property vacancy (best estimate from subsequent HVAC monitoring data and water usage records)
- Time of discovery: Saturday approximately 4:15 PM (property owner return from vacation)
- Duration of exposure: Approximately 3-4 days from estimated failure to discovery and isolation
- Source: Freeze/burst supply line failure in upstairs master bathroom exterior wall assembly during sustained cold snap
- Continued supply flow: Water supply continued flowing through burst supply line for approximately 3-4 days before isolation
- Category classification: Initial Category 1 classification advancing to Category 2 given extended exposure with visible mold development beginning during initial assessment
- Estimated water volume: Approximately 2,000-3,000+ gallons through 3-4 day extended supply flow
Scope Extent
- Total affected area: Approximately 425 square feet across three floors
- Upstairs master bathroom: Approximately 65 square feet including wall cavity, adjacent wall assemblies, tile flooring, and vanity cabinet
- Upstairs master bedroom: Approximately 85 square feet including carpet, padding, adjacent framing, and wall assemblies
- Upstairs adjacent hallway: Approximately 40 square feet carpet from water spread
- Main floor living room ceiling: Approximately 65 square feet substantial ceiling drywall saturation from direct cascade
- Main floor living room: Approximately 95 square feet including hardwood flooring (substantial saturation with cupping and warping) requiring replacement
- Basement family room: Approximately 75 square feet including carpet, padding, and adjacent ceiling drywall from continued cascade
Response Timeline
Emergency Response (4:15 PM – 5:35 PM)
- 4:15 PM: Property owner discovery upon return from vacation
- 4:18 PM: Property owner isolated water at main water shutoff after quick assessment of extent
- 4:22 PM: Property owner contacted Pure Flow emergency line describing extended-exposure scenario
- 4:28 PM: Emergency dispatch initiated with substantial extraction equipment plus Category 2 and mold remediation preparation given extended-exposure scope
- 5:35 PM: Response team arrival (67 minutes reflecting Saturday afternoon travel time from Riverton HQ to suburban Bluffdale property)
Initial Assessment (5:35 PM – 6:45 PM)
- Assessment of extended-exposure scope across three floors
- Initial Category 1 classification but visible surface mold development beginning during assessment indicated Category 2 reclassification appropriate
- Visible mold development in specific wall cavity areas warranting concurrent Category 2 water damage protocols with IICRC S520 mold remediation for developed areas
- Substantial scope assessment across upstairs bathroom and bedroom, main floor ceiling and hardwood, basement family room
- Property owner and family alternative accommodation coordination given scope extent and extended response timeline
Category 2 Classification Rationale
- Extended exposure time (3-4 days) approached upper limit of typical Category 1 timeframe
- Visible surface mold development beginning during initial assessment indicated microbial activity
- Category 2 reclassification supported comprehensive scope response including porous material removal for extensively saturated materials rather than salvage-attempted
- Category 2 protocols also warranted more extensive antimicrobial application and closer mold-prevention monitoring
Initial Extraction and Removal (Day 1 evening – Day 2)
- Substantial truck-mount and portable extraction across all three floors
- Category 2 protocol porous material removal (carpet, padding, saturated drywall) rather than salvage-attempted
- Systematic ceiling drywall removal from main floor and basement ceilings (extensive substrate saturation)
- Hardwood flooring assessment identified substantial cupping, warping, and dimensional instability requiring replacement rather than salvage
- Contaminated material collection with adjustments for Category 2 versus Category 3 handling
Mold Remediation Establishment (Day 2 – Day 3)
- Isolated containment establishment around specific wall cavity areas with visible mold development
- Personnel PPE for mold remediation portions including full-face P100 respirators, Tyvek suits
- Systematic contaminated material removal from mold-affected wall cavities
- Framing surface remediation including scrubbing, HEPA vacuum, and antimicrobial application
- EPA List N registered antimicrobial application (Benefect Decon 30, Bioesque)
Comprehensive Drying Phase (Days 3-9)
- Coordinated drying phase across all three floors requiring substantial equipment deployment
- 7 LGR dehumidifiers with 18 axial air movers distributed across all affected areas
- Extended drying timeline reflecting extensive scope and extended-exposure characteristics
- Thermal imaging assessment throughout drying phase for hidden moisture identification
- Multiple antimicrobial application cycles across drying phase
- Wall assembly and framing assessment continuing during drying phase
Verification Phase (Day 9)
- Post-remediation verification for mold-affected areas through surface sampling
- Third-party accredited laboratory analysis
- Verification confirmed successful mold remediation with microbial levels within acceptable range
- Moisture verification across all remaining affected areas confirming complete drying
Reconstruction Phase (Days 10-18)
- Days 10-11: Drywall installation across all affected wall areas and ceiling areas (substantial scope)
- Days 12-13: Drywall finishing including taping, mudding, texture matching, and priming across substantial scope
- Days 14-15: Hardwood flooring replacement in main floor living room including preparation, installation, and initial finishing
- Day 16: Paint matching and painting across all affected areas
- Day 17: Carpet and padding installation in upstairs master bedroom, hallway, and basement family room; bathroom vanity cabinet replacement
- Day 18: Hardwood floor finishing completion and final cleaning; final coordination completion
Equipment Deployment Detail
Comprehensive Dehumidification (Elevation-Adjusted)
Bluffdale’s approximately 4,436-foot elevation produces approximately 15% dehumidifier capacity reduction. Substantial scope required extensive dehumidification deployment:
- Upstairs equipment: 2 Phoenix R200 LGR (170 pints/day adjusted combined) with 5 axial air movers for master bathroom, master bedroom, and hallway coverage
- Main floor equipment: 2 Phoenix R200 LGR (170 pints/day adjusted combined) with 6 axial air movers plus Injectidry directed system for hardwood specialty drying and general coverage
- Basement equipment: 2 Dri-Eaz DrizAir 2400 LGR (170 pints/day adjusted combined) and 1 Phoenix R150 LGR (64 pints/day adjusted) with 7 axial air movers for family room and ceiling coverage
- Total dehumidification capacity: Approximately 574 pints/day adjusted across three floors
- Total air movement: 18 axial air movers plus specialty Injectidry system
Mold Remediation Equipment
- AlorAir CleanShield HEPA 550 AFD: Negative pressure differential for isolated containment areas
- Nilfisk GM80 HEPA vacuum: Framing and hard surface HEPA vacuum cleaning
- Personnel PPE: Tyvek suits, full-face P100 respirators, chemical-resistant gloves and boots
- Containment materials: 6-mil polyethylene sheeting with zippered access for isolated wall cavity areas
Antimicrobials
- Benefect Decon 30: EPA List N registered antimicrobial primary application
- Bioesque Botanical Disinfectant Solution: EPA List N registered antimicrobial supplemental application
- Multiple application cycles across scope duration
Specialty Equipment
- Injectidry directed drying system: Initial hardwood salvage assessment attempt; determined unsuccessful given cupping extent requiring replacement
- Enhanced thermal imaging: Multiple thermal imaging sessions across scope duration supporting hidden moisture identification
Assessment Equipment
- Moisture meter: Delmhorst BD-2100 for penetration moisture measurement
- Non-invasive moisture meter: Wagner MMC220 for hardwood and surface moisture measurement
- Thermal imaging: FLIR C5 for non-invasive substrate moisture assessment
- Surface sampling: Third-party accredited laboratory analysis for mold verification
Technical Decisions
Category Classification Escalation
- Extended exposure time approaching or exceeding typical Category 1 timeframe (typically 24-48+ hours) supports Category 2 reclassification consideration
- Visible mold development at initial assessment indicated microbial activity supporting Category 2 classification
- Category 2 classification supported comprehensive scope response with porous material removal rather than salvage-attempted
- Alternative Category 1 maintenance would have produced inadequate response for scope characteristics
Concurrent Water Damage and Mold Remediation
- Scope required concurrent Category 2 water damage response plus IICRC S520 mold remediation for developed mold areas
- Isolated containment for specific mold-affected wall cavity areas rather than whole-scope containment
- Concurrent response protocols enable comprehensive scope resolution within reasonable timeline
- Alternative sequential approach (water damage response followed by separate mold remediation) would have substantially extended total timeline
Hardwood Flooring Assessment
- Initial hardwood salvage assessment attempted through Injectidry directed drying system
- Substantial cupping, warping, and dimensional instability from extended exposure determined salvage not successful
- Replacement rather than salvage warranted for extended-exposure hardwood scope
- Comparison to prompt-response hardwood salvage: prompt response typically supports salvage with 60-70% cost savings; extended-exposure typically requires replacement
Extended-Exposure Scope Considerations
- Extended-exposure scope warranted substantially higher equipment density than typical prompt-response scope
- Wall assembly and framing assessment more extensive given potential deeper penetration during extended exposure
- Thermal imaging assessment more frequent supporting hidden moisture identification
- Mold-prevention monitoring more emphasized given actual mold development identified during initial assessment
- Drying phase extended substantially reflecting extended-exposure scope characteristics
Alternative Accommodation Coordination
- Scope extent and response timeline warranted property owner and family alternative accommodation during initial response period
- Alternative accommodation reduces property owner exposure to response activity and supports family comfort
- Insurance coverage typically includes additional living expenses for necessary alternative accommodation during covered event
- Property owner and family returned to property during reconstruction phase when accommodation impact was reduced
Insurance Coordination
- Sudden and accidental freeze/burst supply line failure covered under property owner standard homeowners insurance policy
- Extended-exposure scope typically fully covered as long as event is sudden and accidental
- Mold remediation coverage under mold coverage endorsement (property owner had mold coverage endorsement providing coverage for mold remediation portion)
- Additional living expenses coverage supported temporary accommodation during initial response period
- Complete documentation including Category classification progression, extended-exposure factors, and concurrent mold remediation supported claim processing
Outcome Summary
Timeline
- Emergency response to arrival: 67 minutes (from initial contact)
- Initial assessment and extraction: Approximately 1.5 days
- Mold remediation establishment: 1 day
- Comprehensive drying phase: 7 days
- Verification phase: Day 9
- Reconstruction phase: 9 days
- Total comprehensive response timeline: Approximately 18 days from event discovery to pre-loss condition restoration
Scope Value
- Total scope: $18,600
- Categories included: Emergency dispatch, extended extraction, mold remediation portion (containment, PPE, contaminated material removal, HEPA vacuum, EPA List N antimicrobial, post-remediation verification), comprehensive drying phase equipment and monitoring, thermal imaging assessment, extensive reconstruction (drywall repair across three floors, ceiling drywall installation, hardwood flooring replacement, painting, carpet and padding installation, bathroom cabinet replacement)
- Insurance coverage: Complete response scope covered under standard homeowners policy plus mold remediation coverage endorsement with applicable deductibles
- Additional living expenses: Alternative accommodation covered under additional living expenses coverage
- Hardwood replacement: Approximately $3,200 included in scope for main floor living room replacement
- Scope value per square foot: Approximately $44 per sq ft reflecting extended-exposure scope complexity plus concurrent mold remediation
Client Outcome
- Complete restoration to pre-loss condition
- Mold remediation verification confirming successful concurrent scope resolution
- Property owner satisfaction with comprehensive scope response including alternative accommodation coordination
- Property owner discussion regarding extended-vacancy prevention approaches
Extended-Vacancy Prevention Learning Applied
- Extended-vacancy scenarios elevate substantial extended-exposure scope risk during freeze events
- Water shutoff during extended vacancy substantially reduces freeze/burst extended-exposure scope potential
- Property temperature monitoring during extended vacancy supports early identification of heating failures or extreme conditions
- Property monitoring services or neighbor check-in arrangements support prompt response during extended-vacancy issues
- Smart home monitoring including water sensors, temperature sensors, and automatic shutoff valves substantially reduce extended-vacancy scope potential
Related Content
- All Case Studies — complete case study documentation.
- Bluffdale Location Overview — complete Bluffdale coverage.
- Water Damage Restoration Bluffdale — complete restoration scope.
- Mold Remediation Bluffdale — Bluffdale mold scope.
- Mold Remediation Methodology — comprehensive methodology.
- Storm Damage — weather-related scope.
- Contact Us — complete contact information.
Frequently Asked Questions
- How can freeze/burst supply lines fail during winter with heat running?
- Freeze/burst supply line failures occur when supply line temperature drops below freezing (32°F) despite general property heating, typically at specific vulnerable locations. Vulnerable location factors: supply lines in exterior wall assemblies exposed to reduced insulation and adjacent to exterior wall surface; supply lines in attic spaces above insulation with reduced heating; supply lines in unheated spaces (garage, unfinished basement corners, mechanical rooms with reduced heating); supply lines with reduced insulation coverage; supply lines with air infiltration exposure at wall penetrations. Cold snap conditions accelerate risk: sustained temperatures below 10°F create substantial heat loss through building envelope; extended cold snap duration allows heat penetration into wall assemblies to reach freezing conditions; wind chill can substantially accelerate freeze risk at exterior wall assemblies; localized cold spots develop in vulnerable areas even with general property heating. Supply line specifics: copper supply lines have some thermal capacity supporting resistance to freeze; PEX supply lines have some flexibility supporting freeze resistance without rupture in some scenarios; galvanized supply lines have limited freeze resistance and substantial rupture risk; older or corroded supply lines have elevated rupture risk regardless of freeze duration. Building envelope factors: adequate insulation at vulnerable wall locations substantially reduces freeze risk; air infiltration control at wall penetrations reduces cold air exposure; interior door opening to allow heat circulation to vulnerable areas during cold snap periods; kitchen and bathroom cabinet opening allowing heat access to supply lines during cold snap. Prevention approaches: interior heating maintained at minimum 55°F during vacancy periods; cabinet doors open during cold snap periods; interior door opening for heat circulation; wall assembly insulation upgrades for vulnerable areas; supply line insulation for accessible sections; smart home temperature monitoring during vacancy; property owner adjustments during extreme cold snap events. For this Bluffdale property: interior heating was maintained during vacancy but supply line at vulnerable wall assembly location experienced freeze during sustained cold snap; property owner discussion regarding vulnerable location assessment and prevention improvements for future.
- Should I turn off water during extended vacations?
- Yes, turning off water at main shutoff during extended vacations (typically 3+ day absences) substantially reduces water damage scope potential regardless of failure type. Water shutoff benefits during vacancy: eliminates supply flow through burst supply lines during freeze/burst events; eliminates supply flow through supply line failures from other causes; eliminates supply flow through appliance failures (water heater, washing machine, dishwasher, refrigerator ice maker); eliminates supply flow through toilet flush valve or supply line failures; substantially reduces total water volume potential regardless of failure timing during vacancy; substantially reduces extended-exposure scope potential for delayed discovery scenarios. Water shutoff considerations: main water shutoff typically located at property water main entry (often in basement or utility closet); some properties have primary shutoff at property line requiring specific tool for access; ensure primary shutoff functions properly (aging valves may be difficult to operate); document shutoff location for property owner reference. Prevention for water shutoff scenarios: drain water lines after shutoff to prevent residual water freeze in supply lines; consider draining hot water heater tank for extended vacancy in freeze conditions; consider ice maker line isolation and drain; consider washing machine hose disconnection for extended vacancy; interior heating maintained at minimum 55°F for property protection despite water shutoff. Alternative approaches for shorter vacancies: automatic water shutoff valve with leak detection (activates shutoff during leak detection; typical cost $300-$800 installed); leak detection sensors with smart home alerts (property owner or house-watcher notification of any leak); regular house-watcher check-ins during vacancy (family, neighbor, or professional service). Extended vacation planning: comprehensive vacancy planning including water shutoff, heating adjustment, security considerations, and monitoring arrangements substantially reduces scope potential; combined approach provides multi-layer protection against various failure scenarios. For this Bluffdale property: extended vacation without water shutoff created substantial extended-exposure scope potential; failure timing during cold snap and extended discovery time produced substantial scope; water shutoff would have substantially reduced scope potential regardless of freeze/burst event.
- What’s the difference between Category 1 and Category 2 for extended-exposure scope?
- Category classification for extended-exposure scope reflects both water source characteristics and elapsed time factors, with reclassification appropriate when specific conditions develop during exposure period. IICRC S500 Category classification during extended exposure: Category 1 clean water source (municipal water, water heater tank, ice maker supply) can maintain Category 1 classification during shorter exposure periods (typically under 24-48 hours) with proper response; Category 1 to Category 2 reclassification triggered by extended exposure time (typically 24-48+ hours), visible microbial activity, visible contamination progression, or property water quality issues; Category 2 to Category 3 reclassification triggered by extensive microbial activity, sewage source introduction, or other substantial contamination progression. Extended-exposure Category 2 characteristics: extended standing water time supports microbial development in previously clean water source; visible mold development at initial assessment indicates active microbial activity supporting reclassification; wall cavity moisture combined with cool temperatures supports substantial mold development potential; ceiling drywall saturation combined with joist assembly contact supports substrate mold development; extensive scope area supports more extensive microbial exposure and development opportunity. Category 2 protocol differences from Category 1: comprehensive porous material removal (carpet, padding, saturated drywall) rather than salvage-attempted; more extensive antimicrobial application; closer mold-prevention monitoring throughout response; more extensive thermal imaging assessment for hidden moisture; extended drying timeline typical for Category 2 scope. Category 3 versus Category 2 distinctions: Category 3 typically reserved for sewage source or extensive established mold contamination; Category 2 covers extended-exposure clean water source with microbial activity development; Category 3 requires full containment and specialized PPE for all personnel; Category 2 typically doesn’t require full containment (isolated containment for specific mold-affected areas as needed). For this Bluffdale extended-exposure scope: extended 3-4 day exposure combined with visible mold development supported Category 2 classification with concurrent isolated IICRC S520 mold remediation for specific mold-affected areas; comprehensive Category 2 scope with mold remediation appropriate rather than Category 3 protocols reserved for grossly contaminated sources.
- Why couldn’t the hardwood floor be saved?
- Hardwood floor salvage requires prompt response combined with limited exposure conditions; extended-exposure scope typically produces hardwood damage exceeding salvage-favorable conditions. Hardwood salvage-favorable conditions: prompt response (typically within 24-48 hours of water contact); Category 1 clean water source; limited standing water time and depth; solid hardwood construction typically more salvageable than engineered; minimal cupping, crown warping, or dimensional instability at initial assessment; specialty extraction and drying equipment (Injectidry directed system, weighted extraction). Extended-exposure hardwood damage characteristics: substantial cupping (edges rising higher than center of individual boards); crown warping (center of boards rising higher than edges); dimensional instability affecting board dimensions; joint separation and gap development; substrate deterioration below hardwood (subfloor material affected); potential mold development between hardwood and substrate; irreversible dimensional and structural changes. Salvage assessment during response: initial specialty equipment deployment attempted for hardwood salvage assessment; substantial cupping and dimensional instability identified during initial assessment; controlled drying attempt produced continued instability rather than dimensional recovery; salvage determined not successful requiring replacement. Comparison with prompt-response hardwood salvage: prompt-response hardwood salvage typical success rate 60-80% for solid hardwood with Category 1 clean water source; extended-exposure hardwood salvage success rate substantially reduced (typically under 20-30% for 72+ hour exposure); extended-exposure often produces irreversible damage requiring replacement regardless of specialty equipment approach. Replacement scope: hardwood replacement typical cost $8-$20+ per square foot depending on species, finish quality, and installation complexity; approximately 95 sq ft main floor replacement in this scope approximately $3,200 replacement cost; refinishing coordination for surrounding areas may be required for appearance consistency. Extended-exposure hardwood scope typically supports replacement rather than salvage; prompt-response hardwood salvage remains the goal when timing supports salvage-favorable conditions. Salvage decisions should be based on objective assessment rather than cost optimization alone; unsuccessful salvage attempts produce delayed replacement adding scope value without benefit.
- What smart home technology could have prevented or reduced this scope?
- Multiple smart home technology approaches substantially reduce extended-vacancy freeze/burst scope potential through combination of monitoring, notification, and automatic response capabilities. Water damage monitoring and prevention: leak detection sensors (typical cost $20-$100 per sensor) placed at vulnerable water locations providing early notification through smart home integration or mobile alerts; automatic water shutoff valve with leak detection integration (typical cost $300-$800 installed) providing automatic water isolation upon leak detection without property owner intervention required; whole-property water usage monitoring identifying unusual water flow patterns indicating potential supply line failure; smart water meter integration providing water usage alerts and remote shutoff capability. Temperature monitoring for freeze prevention: interior temperature monitoring with mobile alerts identifying heating failures during vacancy; smart thermostat with remote monitoring and adjustment capability; temperature sensors in vulnerable areas (basement, garage, exterior wall assemblies) providing localized temperature monitoring; humidity monitoring supporting overall building environment assessment. Property monitoring during vacancy: security camera systems providing visual verification during vacancy; smart home hub integration coordinating monitoring systems; mobile alerts for various property conditions; professional property monitoring service integration option. Vacancy-specific arrangements: automatic water shutoff during extended vacancy through smart home programming; interior temperature maintenance during vacancy with monitoring; scheduled house-watcher check-ins coordinated with smart home monitoring; neighbor notification of vacancy period and monitoring arrangements. Cost/benefit analysis: comprehensive smart home water damage prevention typical cost $500-$2,500 depending on system extent; typical extended-vacancy scope value $10,000-$25,000+ per event; cost/benefit strongly favors smart home protection for extended-vacation property owners; insurance discounts sometimes available for smart home water protection installation. For this Bluffdale property: property owner discussion regarding comprehensive smart home water damage prevention installation for future extended vacation periods; property owner scheduled automatic water shutoff valve and leak detection sensor installation combined with smart temperature monitoring for comprehensive vacancy protection. Smart home technology combined with basic water shutoff practices during vacancy provides substantial extended-vacancy scope prevention.
Contact Pure Flow Water Damage & Restoration — Bluffdale Freeze/Burst Case Study Reference
Comprehensive water damage restoration and mold remediation for Bluffdale including extended-exposure scope response. Full IICRC S500 water damage restoration and S520 mold remediation certification supporting concurrent scope response including Category 2 water damage with concurrent mold remediation, extended-exposure protocols, and comprehensive equipment deployment across multi-floor scope. Alternative accommodation coordination for extensive scope periods. Elevation-adjusted equipment deployment reflecting Bluffdale’s approximately 4,436-foot elevation.
- Emergency Line (24/7): (385) 289-3753
- Address: 5069 13400 S #400, Riverton, UT 84096
- Email: info@pureflowwaterdamagerestoration.xyz
- Utah DOPL Contractor License: #13845621-5501 (S220 Small Commercial & Residential)
- IICRC Certifications: WRT, ASD, AMRT, FSRT
Office Hours
- Emergency Service: 24 hours a day, 7 days a week
- Office Staff: Monday – Saturday, 9:00 AM – 5:00 PM
- Closed: Sundays and State/Federal Holidays (emergency line always active)
