Top Restoration Company In The Area

“We Help Businesses & Families Through Difficult Times”

Our Process | Riverton Water Damage Restoration Workflow

Our Restoration Process

Every water damage response we run in Riverton, Bluffdale, Herriman, South Jordan, Draper, and West Jordan follows the same 8-step protocol regardless of scope size or complexity. The reason for a documented protocol isn’t paperwork — it’s that consistent execution across every job is what produces the outcomes our customers actually want: fast response, defensible scope decisions, documented moisture and category readings, transparent pricing, and complete insurance settlement documentation on first submission rather than after multiple supplemental documentation rounds. A South Jordan Daybreak Category 1 water heater rupture and a West Jordan sewage backup Category 3 event share the same underlying workflow even though the specific scope, equipment, and timeline vary dramatically between them. Restoration process quality is what separates a job that closes cleanly in 30 days with the customer satisfied from a job that drags out for 90+ days with scope disputes, coverage denials, and customer frustration. The process below is how we get to the first outcome consistently.

Step 1: Emergency Response and Initial Assessment

Response time: 2 to 4 hours from initial call under standard call volume conditions, extending to 24 to 72 hours during major regional storm events when call volume overwhelms available crew capacity across Salt Lake Valley restoration contractors. Initial call intake captures: property address and access information, nature of the water damage event (source, time of failure, extent of visible damage), whether the source has been isolated, whether the property is currently safe to occupy, and insurance carrier information for adjuster coordination.

Initial on-site assessment includes:

  • Verification of source isolation and safety assessment (electrical, structural, continued weather exposure).
  • Visual inspection of the affected area and adjacent spaces for hidden water migration.
  • Preliminary IICRC S500 category classification based on water source, contact surfaces, and time-since-loss.
  • Preliminary IICRC S500 class classification based on affected footprint and material composition.
  • Moisture reading survey across the affected assemblies with pin and pinless meters.
  • Photographs of the affected area, source, and initial moisture readings.
  • Homeowner or property manager walkthrough discussing preliminary scope and next steps.

Step 2: Emergency Mitigation

Standing water extraction and initial equipment deployment typically begin during the same visit as the initial assessment, before formal estimate delivery. Emergency mitigation is a covered service under standard HO-3 policies and standard practice on legitimate water damage events is for restoration contractors to begin mitigation immediately rather than delaying response pending adjuster arrival — delays typically increase total claim value rather than reducing it, and insurance carriers understand and expect this practice.

Emergency mitigation scope during the initial visit includes:

  • Standing water extraction using portable or truck-mount equipment depending on scope.
  • Content protection or preliminary pack-out where contents are at continued risk.
  • Initial air mover and dehumidifier deployment sized to the assessed scope.
  • Antimicrobial application where Category 2 or Category 3 classification indicates.
  • Temporary containment or protection where the affected area is adjacent to occupied space.

Step 3: Written Scope and Estimate

Written scope of work and Xactimate-formatted estimate delivered within 24 hours of initial assessment for standard residential response, same-day for time-critical commercial and industrial response. The written scope documents:

  • Category and class classification with supporting rationale (source analysis, moisture readings, time-since-loss factors).
  • Affected area mapping with square footage and material composition.
  • Scope of demolition (what materials will be removed and why).
  • Drying scope (equipment quantity, expected daily equipment days, target drying timeline).
  • Reconstruction scope (what materials will be replaced, specifications, coordination requirements).
  • Xactimate line-item pricing matching insurance carrier expectations.
  • Assumptions and exclusions specifically identified (upgrades, code compliance items, coordination boundaries with specialty trades).

Insurance-covered work coordinates the estimate directly with the assigned insurance adjuster; out-of-pocket work is delivered directly to the homeowner for approval before work proceeds beyond emergency mitigation. Scope approval documented in writing before non-emergency work begins.

Step 4: Structural Drying

Structural drying phase runs typically 3 to 7 days for standard residential response, longer for Class 4 specialty drying situations or large-scope commercial jobs. Daily monitoring documents:

  • Moisture readings across affected assemblies using pin and pinless meters (typically 8 to 20 measurement points per room).
  • Ambient temperature and relative humidity in the affected space and adjacent unaffected space.
  • Dehumidifier grain-depression readings verifying moisture extraction rates.
  • Equipment operating status and any adjustments made during the visit.

Equipment adjustments during the drying phase respond to actual moisture reading data rather than pre-set timelines — drying targets meet when materials reach IICRC S500 dry standard (drywall below 1% MC on pinless meter, framing lumber below 16% MC on pin meter, subfloor below 16% MC on pin meter, hardwood below 12% MC on pin meter), not when a pre-set number of days has elapsed. Drying phase can extend when materials reach elevated moisture readings that indicate additional demolition is required for proper drying; drying phase can conclude earlier than initial estimate when materials dry faster than the conservative projection.

Step 5: Demolition and Remediation

Demolition scope executes based on moisture readings and category classification decisions documented in the written scope. Where post-drying moisture readings indicate additional demolition is required beyond the initial scope, change order documents the additional scope with homeowner and insurance adjuster approval before execution.

Standard demolition scope includes:

  • Drywall removal where readings indicate the material cannot dry in place, typically cut to a defined height above the base plate on wall assemblies or in full sheets on ceiling assemblies.
  • Insulation removal where saturated or where drywall removal provides access.
  • Flooring removal where the material cannot be salvaged through in-place drying (detailed on our flooring page).
  • Cabinet removal where subfloor access is required for drying.
  • Antimicrobial application on framing, subfloor, and other retained materials in Category 2 or Category 3 scope.
  • Debris disposal for standard restoration; regulated waste disposal for Category 3 contamination.

Step 6: Reconstruction

Reconstruction phase rebuilds the property to pre-loss condition under our Utah DOPL S220 contractor license. Standard reconstruction scope includes drywall replacement and finish, insulation replacement, flooring installation, cabinet re-set, trim work, primer, and paint. Specialty trade coordination through licensed subcontractors for electrical, plumbing, HVAC, structural engineering, roofing, and specialty flooring where required. Detailed on our reconstruction and repairs page.

Reconstruction phase timeline typically 5 to 25 days for standard residential response, longer for large-scope or commercial jobs. Timeline coordinates with the homeowner’s ALE displacement coverage (when applicable) so the property is returned to occupancy within the displacement coverage window.

Step 7: Documentation and Insurance Settlement

Complete documentation package delivered to homeowner and insurance carrier at project completion:

  • Xactimate-formatted line-item invoice matching the approved scope of work.
  • Complete photographic record: pre-work condition, in-progress documentation, post-work verification.
  • Daily moisture reading logs supporting the drying scope decisions.
  • Category and class classification documentation.
  • Change order documentation for any scope modifications during the project.
  • Warranty documentation for reconstruction work.
  • Certificate of completion signed by homeowner or property manager.

Insurance settlement typically closes 30 to 90 days after documentation delivery for actual cash value settlement, with depreciation holdback released upon photographic verification of completed reconstruction work. Our documentation is designed to close claims on first submission rather than requiring supplemental documentation rounds.

Step 8: Follow-Up and Warranty

Follow-up call to the homeowner or property manager typically 30 days after project completion verifies satisfaction with the completed work and identifies any warranty items requiring attention. Reconstruction workmanship warranty runs 1 year for standard scope items (drywall, paint, flooring installation), with longer manufacturer warranties on installed materials (typically 5 to 25 years depending on product) coordinated through the manufacturer’s warranty process. Restoration workmanship (moisture verification, category classification decisions) is verified at project completion and doesn’t carry a separate warranty period because the underlying restoration was documented and verified at the time of work.

Post-project follow-up also documents customer feedback for our internal quality tracking — every completed job is reviewed against the initial scope, timeline, and documentation standards to identify any patterns requiring process refinement.

What Makes This Different

Every restoration contractor claims to follow IICRC S500 protocols and provide Xactimate documentation. What actually differs between contractors is:

  • Whether category and class classification are documented with supporting rationale — not just labeled — so the scope decisions are defensible if questioned during settlement.
  • Whether moisture reading data drives scope decisions in real time during the drying phase, or whether default demolition protocols are applied regardless of measured moisture content.
  • Whether change orders are documented in writing with homeowner and insurance adjuster approval before execution, or whether scope changes appear on the final invoice without prior authorization.
  • Whether the reconstruction phase runs under the same contractor as the restoration phase, eliminating coordination gaps and finger-pointing between separate contractors.
  • Whether documentation supports first-submission insurance settlement, or whether supplemental documentation rounds are required after initial submission.
  • Whether elevation, water hardness, and older plumbing failure patterns specific to Salt Lake Valley conditions are recognized and addressed, or whether generic response protocols are applied regardless of regional factors.

Service Area

Our 8-step restoration process applies to every response across the primary Salt Lake Valley service area: Riverton, Bluffdale, Herriman, South Jordan, Draper, and West Jordan. Response protocols scale by scope from small residential Category 1 events through large commercial and industrial Category 3 events, with the underlying documentation and decision-making framework consistent regardless of scope.

Frequently Asked Questions

How long does the whole process take from initial call to completion?
Standard residential water damage response: 2 to 6 weeks from initial call to reconstruction completion depending on scope size, category classification, and specialty trade coordination requirements. Small Category 1 events with minimal reconstruction: 1 to 2 weeks. Medium Category 1 or 2 events with standard reconstruction: 2 to 4 weeks. Large Category 1, 2, or 3 events with extensive reconstruction: 4 to 8 weeks. Commercial and industrial response: variable depending on scope. Insurance settlement typically closes 30 to 90 days after work completion for actual cash value, with depreciation holdback released upon completion verification, and complete settlement including recoverable depreciation often takes 90 to 180 days from initial claim.
Do I have to be home during the restoration work?
Depends on the scope and the specific phase. Initial assessment and homeowner walkthrough require your presence for scope discussion and access authorization. Emergency mitigation and initial equipment deployment typically require your presence for access and equipment placement decisions. Once equipment is deployed and drying is underway, daily monitoring visits can proceed without your presence if access has been arranged (garage code, key box, or coordinated with a family member or neighbor). Reconstruction phase requires periodic homeowner presence for finish selection review, walkthrough on completed work sections, and final walkthrough at project completion. Many homeowners are displaced under ALE coverage during at least some portion of the response and reconstruction period, and coordination for property access during displacement is standard.
How do I know if the drying is really complete?
Drying completion documents through moisture reading verification against IICRC S500 dry standard: drywall below 1% moisture content on non-invasive pinless meter, framing lumber below 16% moisture content on pin meter, subfloor below 16% moisture content on pin meter, hardwood below 12% moisture content on pin meter, and specialty materials at their appropriate dry standard. Final moisture verification readings are documented photographically with the meter display visible and included in the project documentation package. If any material remains above target, the drying phase extends until targets are met — drying doesn’t conclude on a pre-set timeline regardless of actual moisture content. Homeowner or property manager review of the final moisture readings documents mutual verification that drying targets have been met before reconstruction begins.
What if I disagree with a scope decision?
Scope disagreements typically arise around three scenarios: (1) demolition scope where the homeowner would prefer more or less aggressive material removal than the moisture-based scope decision indicates; (2) reconstruction finish selection where the homeowner wants upgrades or changes from the pre-loss finish specification; (3) coverage allocation between insurance-paid scope and out-of-pocket scope. Resolution protocol: review the underlying data (moisture readings, category classification, coverage terms), document the disagreement in writing, coordinate with the insurance adjuster if the scope affects covered work, and reach documented scope agreement before proceeding with disputed work. Where homeowner preferences fall outside insurance-covered scope (upgrades from pre-loss finish, additional scope beyond restoration), the out-of-pocket cost is documented in writing before execution. Scope disagreements are much less common when the initial scope documentation clearly explains the decisions and supporting data.
What if problems come up after the project is complete?
Reconstruction workmanship warranty covers standard construction items (drywall, paint, flooring installation, cabinet re-set) for 1 year from project completion for defects in materials or workmanship. Installed materials carry manufacturer warranties (typically 5 to 25 years depending on product) that coordinate through the manufacturer’s warranty process. Restoration workmanship (moisture verification, category classification, antimicrobial protocol) is verified at project completion through documented moisture readings and doesn’t carry a separate warranty period, but if concerns arise after completion (visible mold growth, persistent odors, etc.), we return for assessment and address any issues attributable to the initial restoration work. Warranty items are handled on standard scheduling — return visits typically within 5 to 10 business days of the warranty call for non-emergency items, faster for anything indicating active damage or safety concerns.

Contact Pure Flow Water Damage & Restoration — Riverton Restoration Process

Our Riverton office runs the 8-step restoration process on every water damage, mold, sewage, fire, and storm damage response across Riverton, Bluffdale, Herriman, South Jordan, Draper, and West Jordan. Every job documents category classification, moisture readings, scope decisions, and reconstruction work at the level of detail that closes insurance claims on first submission and satisfies customer expectations for transparent, defensible restoration.

Contact Us →

Office Hours

  • Emergency Service: 24 hours a day, 7 days a week
  • Office Staff: Monday – Saturday, 9:00 AM – 5:00 PM
  • Closed: Sundays and State/Federal Holidays (emergency line always active)